Ripley Providence Catalyst Truck Works

CLIENT:   BMD URBAN

CONTRACT TYPE:   SCHEDULE OF RATES

COMPLETION DATE:   ONGOING

PROJECT OVERVIEW

ACM has been contracted to construct a two-lane bridge at the entry to the Ripley Providence Development in the Ripley Valley, Ipswich.

The bridge is a three span concrete structure over Bundamba Creek, providing a vehicular, pedestrian and service corridor to the Development.

ACM SCOPE OF WORKS

ACM is responsible for the supply of all labour, plant, equipment and temporary materials associated with the completion of the following elements;

  • Construction of all concrete formwork
  • Placement of concrete reinforcement
  • Placement and finishing of concrete
  • Temporary works engineering and construction
  • Installation of bridge deck units
  • Erection of the bridge furniture, including the bridge guardrail
  • Supply of ACM plant and equipment for site material handling including cranage
  • Construction of the RCP and RCBC culvert base slabs headwalls and end walls

 